  • 75

    MWe

    Installed capacity

  • 648

    GWh

    Annual production

  • 190

    MWth

    Geothermal energy

Svartsengi commenced electricity production in 1976 using geothermal energy. It was Iceland’s first power plant to join together electricity production and energy production for the heating of houses. The plant was built in six stages, the largest of which, Plant 5, began operating in 1999 with a 30 MW turbine as well as a thermal power installation producing hot water at a rate of 240 l/sec. In December 2007, the sixth stage, Plant 6, began operating. This is only for electricity production and the installed capacity is 33 MW. In 2015, hot water production at Svartsengi was increased to meet increasing demand.