Reykjanes Power Plant

Started production in 2006

  • Installed capacity

    100 MWe

    The installed capacity of Reykjanes Power Plant is 100 MWe

  • Annual capacity

    876 GWh

    Annual electricity generation

Reykjanes Power Plant Pipeline

Reykjanes Power Plant began generating electricity for the national grid in May 2006. The plant currently has an installed capacity of 100 MW. Energy for the plant is harnessed from twelve of the fifteen boreholes drilled in the area. There is a long history of using geothermal energy for industries and electricity production in Reykjanes.